Skip to content
Handover Specialist

Service

New Home Handover Inspection

A complete room-by-room inspection of your new home before you accept possession.

Overview

Handover is the right moment to raise defects with your builder: before you accept possession, not after you have moved in.

We inspect every area of the home against our full checklist, from the entrance and main door through to the terrace, external areas and handover documents. Every observation is photographed, classified by priority and recorded in a snag register you can share with the builder.

Newly completed contemporary home at dusk

What we inspect

Entrance & Main Door

  • Door alignment
  • Frame finish
  • Locks/latches
  • Door closer
  • Doorbell
  • Threshold

Living, dining & bedrooms

  • Walls/corners
  • Ceiling
  • Flooring/skirting
  • Cracks/patches
  • Switches/sockets
  • Windows/glass

Kitchen & bathrooms

  • Sink/tap
  • Drainage
  • Floor slope
  • WC/flush
  • Tiles/joints
  • Visible moisture signs

Balcony, utility & terrace

  • Railing
  • Drain
  • Water accumulation
  • Drain outlets
  • Visible waterproofing signs

Handover documents

  • Keys
  • Meter details
  • Appliance manuals
  • Warranty documents
  • Snag closure status

Visual and functional inspection within the agreed scope; not structural certification, concealed-defect guarantee or statutory approval.

Who it’s for

  • Buyers taking possession of a newly built apartment, villa or independent house
  • Owners who want a documented record of the condition of the home at handover
  • Buyers living away from the property who need an independent inspection on their behalf

When to book

  • As soon as your builder announces the handover or possession date
  • Before you sign possession or handover documents

Book your inspection

Book a New Home Handover Inspection.

Tell us about your property and the stage it is at. We will confirm the inspection scope and arrange a visit before your handover.

Call WhatsAppBook an Inspection